Securing a former industrial site polluted with mercury

In late 2020, France's agency for ecological transition, ADEME, tasked the teams at Séché Urgences Interventions (SUI) with securing a former bleach production site in the French department of Somme (80). Contaminated with not only mercury but also asbestos and PCBs, the dilapidated buildings, production facilities, soil, and water will require all the expertise of our chemical hazard specialists.

The deterioration of this former bleach production site, put in compulsory liquidation in 2018, has been endless. Over the years, disrepair, theft, and vandalism had done their worst and weakened its infrastructure. Since the production process of sodium hypochlorite (bleach) involved significant amounts of mercury, the risks to the health of all who entered it and to the environment led the prefecture to issue an order in September 2020 for emergency measures.

 

A PARTICULARLY COMPLEX PROJECT REQUIRING MULTIPLE AREAS OF EXPERTISE

Selected by ADEME for their extensive experience with mercury contamination, the teams at Séché Urgences Intervention (SUI) encountered a complex situation at the site: the roof had deteriorated, scattering asbestos cement debris, and the site contained not only mercury and mercury-contaminated soil but also polychlorinated biphenyl (PCBtransformers and contaminated water.

For the duration of the operations, the teams must wear filter masks with mercury-specific cartridges as well as special suits. Each work has double protective equipment. Decontamination and hygiene showers are mandatory when leaving the polluted area.

Primary emergency: securing the site. Any further intrusion or vandalism must be prevented. Several access ways have been blocked, the fence has been repaired, and barriers have been installed. Signs warning of the presence of mercury have been put up to deter the most reckless.

Decontamination work can then truly begin. Primary objective: to prevent asbestos fibers, which are highly carcinogenic, from spreading even further. The debris is collected, packaged in bags, and sent to a specialized treatment center.

 

DRAWING OUT THE MERCURY

High-efficiency (HEPA) aspirators equipped with activated carbons can then be implemented to recover the mercury found throughout the production building. Several passes will be necessary. After each aspiration, mercury naturally rises from the ground, which is saturated with it. At the same time, the barrels of mercury-contaminated soil found at various locations are repackaged and removed. In total, nearly 600 kg of pure mercury and 12 tons of mercury-contaminated soil will be transported to the Trédi Hombourg (68) hazardous waste platform.

The teams then attack the transformers. They are first drained of their polluting oil (PCB) and then removed using a special crane truck equipped with retention tanks to prevent any leakage. Direction, the Trédi Saint Vulbas (01) treatment center.

The focus will then turn to the 27 1,000 L containers of highly mercury-contaminated products, stored on the site and abandoned when it closed. Their removal will require a complex repacking operation: pumping the liquids and transferring the sludge into new tanks.

 

DRAINING OFF THE CONTAMINATED WATER

The problem of water management remains: the site’s wastewater treatment plant (WWTP) is shut down, and one of its basins is full of polluted water and sludge contaminated with mercury and asbestos. The SUI teams will need three days and five tanks to pump the 120 tons of water and then pack up the 6 m3 of sludge and 20 kg of asbestos found at the bottom of the basin.

To bring this entire emergency operation to a close, the SUI specialists are also responsible for giving recommendations for continuation of the work: containing certain areas to limit the spread of mercury vapor, repairing the roof to prevent rainwater runoff in the workshop, purging and dismantling pipes, installing a new water treatment system… There’s still a long way to go before a complete rehabilitation of the site can be expected, but that’s another story!

 

RESOURCES USED
5 employees trained and authorized to deal with mercury hazards
HEPA aspirators equipped with activated-carbon filters
Ongoing analysis of the level of mercury vapor in the air
Ventilation system to extract mercury vapors
Personal Protective Equipment (PPE) with ventilated masks and special filtration cartridges

Securing the  site Draining the transformers HEPA aspirators

At such a complex “multi-hazard” site, only a seasoned team, trained and authorized to tackle mercury and asbestos hazards and accustomed to wearing Self-Contained Breathing Apparatuses (SCBA), could succeed and carry out the operations in the best safety conditions.

ISO 9001, ISO 14001, and ISO 45001 certified, Séché Urgences Intervention is led by experts who know how to control chemical hazards throughout decontamination operations and are capable of secure management of all the materials (water, sludge, debris, etc.), their removal, and directing them to the appropriate treatment sectors.

ENVIRONMENTAL EMERGENCY?

START HERE :

MORE EMERGENCY INTERVENTIONS

Our solutions in action

Frontignan la Peyrade: decontamination of the former refinery

The site of the former Frontignan la Peyrade refinery, located close to the town center and the coast, is undergoing a major environmental rehabilitation operation. For more than 3 years, teams from Antea Group and Séché Eco Services will be working to clean up the soil, while taking into account the severe constraints imposed by the proximity of local residents. This 11-hectare site presents a number of technical challenges and requires innovative solutions. It will enable the town of Frontignan la Peyrade to reclaim land for the development of a new district, thus meeting its objective of zero net artificial development.
Read more

[Video] A look back at 14 months of extraordinary clean-up work in Saint-Denis

After 14 months of an extraordinary decontamination project, the Saulnier ZAC in Saint-Denis (93) is ready to welcome the future Olympic Aquatic Centre. At the request of the Metropole du Grand Paris, the Séché Group and its partners, Antea and Charier, have joined forces to successfully complete this rehabilitation project, which is located a stone's throw from the Stade de France. A real collective success.
Read more

Visit to the asbestos removal site on the Île aux vaches Natura 2000 site in Tours (37)

Located on the Loire in the heart of the city of Tours, the Île aux vaches is home to all the drinking water wells that supply the city. Contaminated with asbestos following renovation work carried out in 2008, the island, which is classified as a Natura 2000 site and a natural area of ecological, faunistic and floristic interest, had to undergo a particularly complex decontamination operation. Armand Debar and his teams from Séché éco-services did everything possible to filter and evacuate the asbestos cement debris while preserving the silt and sand, preserving the ecosystem and taking all the necessary safety measures for asbestos waste.
Read more

Tour of a demolition and asbestos removal site in Issoudun

Armand Debar, deputy operations manager, takes us on a tour of the demolition and asbestos removal worksite at a historic industrial site, the Lucien Coupet plant in Issoudun in the Indre department (36). Taken over in 2018 by Safran, its dilapidated facilities, formerly dedicated to the production of seats for the aeronautical industry, were to be razed. This was a complex project requiring increased vigilance in terms of the safety of employees and local residents.
Read more

Hello,
We will do our best to answer you as soon as possible.

Merci de renseigner...