To go further

Séché plant worker and yellow vest© Séché Environnement

Our solutions in practice

Frontignan la Peyrade: decontamination of the former refinery

The site of the former Frontignan la Peyrade refinery, located close to the town center and the coast, is undergoing a major environmental rehabilitation operation. For more than 3 years, teams from Antea Group and Séché Eco Services will be working to clean up the soil, while taking into account the severe constraints imposed by the proximity of local residents. This 11-hectare site presents a number of technical challenges and requires innovative solutions. It will enable the town of Frontignan la Peyrade to reclaim land for the development of a new district, thus meeting its objective of zero net artificial development.
Read more

[Video] A look back at 14 months of extraordinary clean-up work in Saint-Denis

After 14 months of an extraordinary decontamination project, the Saulnier ZAC in Saint-Denis (93) is ready to welcome the future Olympic Aquatic Centre. At the request of the Metropole du Grand Paris, the Séché Group and its partners, Antea and Charier, have joined forces to successfully complete this rehabilitation project, which is located a stone's throw from the Stade de France. A real collective success.
Read more

Visit to the asbestos removal site on the Île aux vaches Natura 2000 site in Tours (37)

Located on the Loire in the heart of the city of Tours, the Île aux vaches is home to all the drinking water wells that supply the city. Contaminated with asbestos following renovation work carried out in 2008, the island, which is classified as a Natura 2000 site and a natural area of ecological, faunistic and floristic interest, had to undergo a particularly complex decontamination operation. Armand Debar and his teams from Séché éco-services did everything possible to filter and evacuate the asbestos cement debris while preserving the silt and sand, preserving the ecosystem and taking all the necessary safety measures for asbestos waste.
Read more

Tour of a demolition and asbestos removal site in Issoudun

Armand Debar, deputy operations manager, takes us on a tour of the demolition and asbestos removal worksite at a historic industrial site, the Lucien Coupet plant in Issoudun in the Indre department (36). Taken over in 2018 by Safran, its dilapidated facilities, formerly dedicated to the production of seats for the aeronautical industry, were to be razed. This was a complex project requiring increased vigilance in terms of the safety of employees and local residents.
Read more

Our talents

Raphaël Video director

Are you familiar with the job of video operator?
Control, inspection, geo-referencing, ... For the past fifteen years, Raphaël has been travelling the length and breadth of the Paris region, inspecting and checking sewer networks using cameras and directional robots
Read more

Hadrien QSE Engineer

On decontamination or effluent treatment sites, Hadrien is on hand to ensure that safety rules are respected and that everyone goes home in good health.
Read more

Understand it all

Guaranteeing Health and Safety at the heart of Groupe Séché: the VITALES Rules

For nearly 40 years, Groupe Séché Environnement has made health and safety a core concern. For us, safety is much more than a priority; it is the very foundation of our business. To give concrete expression to this commitment, the Group has developed the VITALES Rules, nine essential principles that anchor our Health and Safety culture and know-how.
Read more